Execution Flow • Digital Shop-Floor Dispatch & WIP Control

Shop-Floor Kanban

Turn your finite Gantt schedule into clear, actionable visual dispatch boards for every work center. Operators see exact operation priorities, slack buffers, delayed alerts, and quantities produced in real time without paper travelers.

Dispatch Model
Resource-Level Visual Queues
Priority Buckets
In Production • Delayed • <1d • Slack
Inside the Shop-Floor Kanban

Real-Time Dispatch Lanes & Slack Telemetry per Machine

Monitor top-level KPIs (In Production, Delayed, On Time <1d, With Slack, Produced) and drill down into individual machine columns like Sprocket Saw 1, Sprocket Saw 2, and Band Saw.

Seed APS Kanban • Sector Execution Board (Serra - 3 Resources)
Seed APS Digital Shop-Floor Kanban Board
01

Live Sector KPI Counters

Track real-time execution pulse across the sector: In Production, Delayed, On Time (< 1d), With Slack, and Produced operations updated continuously.

02

Dedicated Machine Columns

Each resource (e.g., Sprocket Saw 1, Sprocket Saw 2, Band Saw) gets its own prioritized lane directly synchronized with the finite Sequencing Gantt.

03

Urgency & Slack Lanes

Cards are automatically bucketed into In Production, Delayed (red), Up to 1 Day (amber), Slack / Queue (green), and Produced so operators always pull the right job next.

04

Rich Operation Cards

Every Kanban card displays the Work Order & Operation (WO-4938 • OP 10), scheduled start time, item description, Qty produced vs. target, and exact slack days.

Shop-Floor Execution Capabilities

Eliminate paper dispatch lists and align every machine operator with real-time schedule priorities.

Zero-Paper Visual Dispatching

Replace printed daily schedules with live digital Kanban boards on shop-floor tablets, terminals, or large-screen Andon monitors.

Slack-Based Buffer Management

Surface exact schedule slack (in days or hours) on every operation card so supervisors focus attention on critical-path orders rather than jobs with ample buffer.

Strict WIP & Pull Control

Prevent shop-floor congestion and bottlenecks by enforcing Work-In-Process (WIP) limits per cell and releasing upstream work only when downstream capacity opens.

Instant Sync with Gantt & SFDC

Every start, partial quantity report, or completion recorded in SFDC automatically advances the Kanban card and updates the master Sequencing Gantt in real time.

Material & Tool Readiness Signals

Ensure operators only pull jobs whose raw materials, sub-assemblies, and tooling kits are verified available—eliminating mid-run setups and starvation.

Automated Delay Escalation

When an operation enters the Delayed lane or a machine stops, Seed APS AI immediately alerts supervisors and the Control Tower with re-routing options.