AI-Native Supply Chain & APS

AI to Plan & Schedule
Your Supply Chain.

Beyond traditional APS: an AI-powered platform that unifies S&OP, S&OE, MRP, and finite shop-floor scheduling into one conversational ecosystem—centralized by a real-time Control Tower.

Seed APS Gantt Chart
Seed APS AI in MS Teams

Simulate What-If Scenarios

Test capacity, demand, and material changes instantly.

Calculates in < 1 Second

Real-time optimization algorithms for complex factories.

AI at the core, chat as your main interface.

Traditional APS software tells you what's broken through complex menus. Artificial intelligence is the center of Seed APS—your teams simply talk to the system to balance capacity, materials, and business rules.

Create Rules by Conversation

Describe a business rule in plain language, such as priorities, setup policies, or customer commitments, and the AI instantly turns it into a rule the plan respects.

Ask Questions, Get Answers

Ask why an order is late, which materials are critical, or what happens if a machine stops, and get instant, accurate answers based on your real, live plan data.

Support for Every Department

Sales checks delivery dates. Purchasing sees material needs. Production reviews the schedule and bottlenecks. One truth, accessible to everyone through natural conversation.

The Manufacturing Ecosystem

Eight natively integrated modules powering your end-to-end operational lifecycle.

Analytics & Visualization

Dozens of ready-to-use reports. Infinite custom dashboards.

Start immediately with dozens of pre-built industrial reports and operational dashboards—or create your own tailored views inside the platform through natural chat prompts or full HTML, CSS, and JavaScript customization.

Dozens of Pre-Built Reports

Access an extensive library of ready-made KPI dashboards covering OTIF, resource utilization, bottleneck load, setup losses, material shortages, and schedule adherence out of the box.

OTIF & Delays Capacity Load Inventory & MRP

Create Dashboards via Chat

Simply ask the AI in plain language to build a chart, table, or executive dashboard from your live plan data—and save it permanently to your workspace in seconds.

> "Build a weekly dashboard comparing Painting setup hours vs. OTIF by customer."

In-App HTML, CSS & JS Studio

Want pixel-level control? Develop your own interactive reports, custom KPI widgets, and shop-floor screens directly inside Seed APS using standard HTML, CSS, and JavaScript.

HTML5 CSS3 JavaScript
Seamless Connectivity

Connect to anything. Build APIs with AI.

Plug Seed APS directly into your existing industrial stack without months of custom middleware. Sync bi-directionally with enterprise systems, flat files, or let AI generate custom connectors on the fly.

ERP, MES & BI Ecosystems

Native bi-directional synchronization with your core enterprise platforms. Pull master data, BOMs, routings, and stock levels, and push optimized schedules back automatically.

SAP & SAP B1 MS Dynamics TOTVS • Senior • Sankhya MES & BI

Spreadsheets & Structured Files

Need fast onboarding or automated batch exchanges? Ingest and export data effortlessly using spreadsheets or structured file pipelines with schema validation.

.XLSX .CSV .TXT .JSON .XML

Real-Time Open APIs

Event-driven REST, OData, and Webhook endpoints allow instant order injection, real-time capacity checks, and live telemetry updates across cloud or on-premise environments.

REST OData Webhooks
AI Integration Engine

Dynamically Build & Map APIs Using AI

Eliminate rigid integration bottlenecks. Simply provide your external API documentation, sample payloads, or legacy schemas—Seed APS AI automatically generates endpoints, maps fields, transforms data structures, and deploys live connectors in minutes.

seed-ai-connector

> Prompt: "Create an API endpoint to sync ERP production orders and map XML routing steps to Sequencing."

✓ Schema & XML parser generated

✓ Field mapping verified (18/18 fields)

✓ Live: POST /api/v1/connectors/erp-orders

Proven in Mission-Critical Industrial Operations

Global Leaders Powered by Seed APS.

View All 7 Enterprise Case Studies →